A fine-finished residential project in Kuala Lumpur delivering 1,200 integrated bath units with antibacterial color-steel wall systems for clean, durable and fast install.
Factory prefabrication plus on-site dry install: panels, ceilings/floors and MEP prep are done in plant; site work focuses on setting and seams — about 40% faster than wet trade methods.
Antibacterial, easy-clean surfaces with fewer joints suit SE Asia humid climates and fit-out standards. Drawings, install videos and local spare parts support are included after handover.